What is Engineering Change Notice or ECN

Unsplash

Unsplash

An ECN ia an official notice that  change has been approved

Unsplash

The design and development head checks the feasibility as per design requirements.

Unsplash

Engineering change note request raised to the concerned department.

Unsplash

After doing the needful correction as per ECN, Validate the Process and product.

Unsplash

Prepare the samples & generate the ECN report & submit a sample to the customer as per APQP Matrix for getting approval & feedback

Unsplash

 In case, if the customer requires any correction in samples then resubmit the sample after the required rectification till customer approval.

Unsplash

– After that use the identification tag in 3 lots for ECN part supply.

Unsplash

– If any ECN is raised internally for any product level change, approval from the customer must be taken.

Unsplash

For more detail about ECN or New development follow the link below: